Guiyang Oukade Industrial Automation Technology Co., Ltd. is located in Guiyang City, Guizhou Province. Our company is a high-tech company integrating R&D, production and sales. The company is a company specializing in the production of automation equipment for tunnel and subway projects. The equipment mainly includes a full set of automation equipment for tunnel and subway arch support construction such as grille flower arch frame splayed bar forming machine, CNC tunnel support mesh welding machine, CNC combined punching and shearing machine, small conduit tip processing machine, etc.
The equipment is mainly used in large-scale construction fields such as tunnels, subways, large bridges, highways, high-speed railways, municipal construction, etc. At the same time, our company's top engineering R&D team, which is used in a large number of engineering machinery fields, can undertake automation transformation and maintenance services in all aspects of the construction field of engineering projects, and can customize non-standard automation equipment according to the special requirements of customers.
The company has established a complete sales and service network across the country to ensure that customers have no worries. We have established long-term cooperative relationships with China Railway and China Construction Engineering Corporation project customers such as the China Railway No. 1 Bureau, the China Railway No. 16 Bureau, the China Railway No. 20 Bureau, the China Communications Construction Company, the Second Harbor Engineering Co., Ltd., the Fifth Hydropower Bureau. It has received unanimous praise and recognition from customers.
Tunnel advanced small conduit tip processing machine (small conduit tapered tip processing machine) is professionally used for tunnel advance support grouting small conduit tapered tip processing operation instructions
Place the machine indoors There is a reliable ground (or zero connection) on the flat ground
Fill the anti-wear hydraulic oil level injected into the tank to the top of the liquid level gauge
Equip a water tank and install the water pump and connect the water pipe
Check whether the guide sleeve heating copper tube on the front side of the material rack and the rack feed inlet are in line to ensure smooth feeding during operation
Check whether there are any abnormalities in the circuit and foot switch in the electric control box, such as If no abnormality is found in the circuit, the host power cord can be connected.
Start the water pump first to ensure that the water circulation is normal, that is, the water shortage indicator light on the electric control box does not light up
Rotate the power adjustment button to adjust the input current
Turn on the timer to adjust the heating time. Generally, the greater the current, the greater the heating. The shorter the time required. (Heating time is usually about seconds)
Start the oil pump to ensure normal circulation of the oil pump oil circuit
Start the host after the water and oil circuits circulate normally
Small catheter processing machine, small catheter tip processing machine, small catheter automatic punching machine